Wheeled Mobile Conveyor
Wheeled radial mobile conveyor with 360° slew and 9-30 m reach for ports, quarries and mines.…
Learn moreThree mobile stackers placed after a screening station to build mine stockpiles without wheel loaders.
Three sets of wheeled mobile stackers were placed after a screening mobile station in a Philippine mine, making stacking convenient and removing the need for wheel loaders to build stockpiles.
The Philippine mine runs a mobile screening station whose output previously relied on wheel loaders to form stockpiles. That approach tied up machines and operators and raised maintenance cost.
The operator wanted a direct, continuous path from screen to pile that freed loaders for other duties.
SANTO positioned three wheeled mobile stackers immediately after the screening station. Their adjustable discharge builds tidy piles with no double handling.
Because the stackers are mobile, they can be shifted as the screen moves, keeping the conveying distance short and the pile accessible.

The site runs well and the customer is very satisfied. Removing loaders from the stacking loop cut both labour and maintenance expense while improving pile quality.
The approach mirrors the benefits described on our mining and quarrying page for mobile conveying.
On a relatively firm, prepared mine yard the wheeled units are simpler and quicker to reposition between screen locations while still delivering the needed mobility.
By stacking directly from the screen, the loaders previously used for stockpiling are released for loading and haulage, cutting both labour and service hours.
Wheeled radial mobile conveyor with 360° slew and 9-30 m reach for ports, quarries and mines.…
Learn moreSANTO tracked stockpilers and mobile conveyors link crushers, screens and stockpiles in…
Learn moreA SANTO tracked mobile conveyor stacks output from mobile screening stations in Russia, moving…
Learn moreFive TS130 tracked mobile stockpilers were supplied for mine stacking in Laos, inspected and…
Learn moreSend us your material, required capacity and site layout. SANTO engineers will size the equipment and return a configuration proposal within 12 hours — no obligation.