Tracked Stockpiler
Tracked stockpiler with 15-30 m belt and up to 1000 t/h for crushers and screeners. Heavy…
Learn moreA fleet of TS130 tracked stockpilers configured for continuous mine-site stacking in Laos.
A customer in Laos purchased five sets of tracked mobile stockpilers TS130 for mine stacking. The equipment passed inspection and was dispatched to the customer site.
The Laos operation needed several stockpilers working in parallel to keep pace with mine output and build multiple segregated piles. A single machine could not cover the required area or throughput.
They opted for the TS130 because its design features support long, continuous duty and simple on-site operation.
SANTO supplied five TS130 tracked mobile stockpilers, each with a highly efficient hydraulic drive offering variable belt speed, low fuel consumption, adjustable feed height and variable discharge height.
All five units were inspected before shipment, confirming build and safety checks, then sent to the mine site for deployment.

The fleet gives the operator redundant, movable stacking capacity that follows the working face. Low fuel use and simple hydraulics keep operating cost predictable.
The tracked stockpiler family is detailed further in our product and mining pages.
The TS130 offers an efficient hydraulic drive, variable belt speed, low fuel consumption, and adjustable feed and discharge heights for flexible mine stacking.
Multiple stockpilers provide redundancy and let the operator build several piles at once while following different parts of an advancing working face.
Tracked stockpiler with 15-30 m belt and up to 1000 t/h for crushers and screeners. Heavy…
Learn moreSANTO tracked stackers and feeders handle copper ore and concentrate. Abrasion-resistant,…
Learn moreSANTO tracked stockpilers and mobile conveyors link crushers, screens and stockpiles in…
Learn moreSANTO configured a TU1215 unloader, TS820 crawler conveyor and TS820R radial stacker for…
Learn moreSend us your material, required capacity and site layout. SANTO engineers will size the equipment and return a configuration proposal within 12 hours — no obligation.