Mobile Ship Loader
Mobile ship loader on wheels or tracks for coal, ore, grain and cement at ports. High…
Learn moreA river terminal uses a SANTO mobile ship loader to barge-load coal without fixed wharf infrastructure.
A coal river terminal deployed a SANTO mobile ship loader to transfer stockpiled coal onto barges at up to 1000 t/h, avoiding the cost and lead time of a fixed loading tower.
The terminal sits on a variable water-level river where fixed loaders would need deep piling and a fixed jetty. Seasonal draft changes also shift the optimal loading point.
Management wanted a loader that could track the waterline and serve several berths from one machine.
SANTO supplied a mobile ship loader with a telescoping, slewing boom that reaches the barge hatch while the chassis stays on the wharf. Belt speed and boom position are tuned to coal flow.
Because the unit is mobile, the terminal skips civil works and can relocate the loader as the riverbank handling plan changes through the year.

At up to 1000 t/h the loader keeps barges turning quickly, and the controlled boom drop limits coal fines and dust at the hatch.
Our coal handling and ports pages cover related bulk strategies.
It avoids expensive fixed jetty and piling works and can move with the waterline, serving multiple berths from one machine.
The mobile ship loader handles up to roughly 1000 tonnes per hour of coal, adjustable via belt speed to match the stockpile feeder.
Mobile ship loader on wheels or tracks for coal, ore, grain and cement at ports. High…
Learn moreSANTO mobile ship loaders and radial stackers cut vessel load/discharge times in ports and…
Learn moreSANTO mobile conveyors and stackers handle thermal and coking coal — dust-controlled,…
Learn moreA representative SANTO radial telescopic stacker deployment at a Southeast Asian fertilizer…
Learn moreSANTO mobile truck unloaders give ports flexible, adjustable conveying that cuts installation…
Learn moreSend us your material, required capacity and site layout. SANTO engineers will size the equipment and return a configuration proposal within 12 hours — no obligation.