Mobile Truck Unloader
Mobile truck unloader for bulk solids, 15-18 m belt, 700 t/h, VFD and adjustable platform.…
Learn moreA grain terminal uses a SANTO mobile truck unloader for fast, gentle intake of wheat and corn.
A grain terminal installed a SANTO mobile truck unloader to draw wheat and corn directly from delivery trucks at up to 600 t/h, protecting grain quality during intake.
Harvest surges overwhelm manual intake, and rough handling breaks kernels and raises spoilage risk. The terminal needed high, gentle throughput that followed truck arrivals.
A mobile unloader let them position intake close to the weighbridge and shift as the yard plan changed.
SANTO supplied a mobile truck unloader with a non-slip, wear-resistant belt and adjustable speed tuned to wheat and corn. The hopper receives direct tipping from trucks.
Because flow is controlled, the terminal links the unloader to scalper and conveyor systems without surge, keeping the grain intact.

At up to 600 t/h the terminal clears truck queues during peak harvest while preserving kernel quality and cutting labour.
Our grain handling and terminals pages cover related workflows.
The mobile truck unloader handles up to about 600 tonnes per hour of wheat or corn, with belt speed adjusted to protect grain quality.
Yes. By changing belt speed and belt material the same unloader handles wheat, corn, rice and soybeans within standard bulk limits.
Mobile truck unloader for bulk solids, 15-18 m belt, 700 t/h, VFD and adjustable platform.…
Learn moreSANTO mobile conveyors and unloaders handle grain gently. Low breakage, dust-safe transfer for…
Learn moreSANTO mobile ship loaders and radial stackers cut vessel load/discharge times in ports and…
Learn moreA representative SANTO wheeled radial telescopic stacker building compost windrows at up to…
Learn moreSANTO TU1215 low truck unloader conveys corn in Thailand at 500 t/h, drawing grain straight…
Learn moreSend us your material, required capacity and site layout. SANTO engineers will size the equipment and return a configuration proposal within 12 hours — no obligation.